In Riedstadt, Germany, Wagenborg Foxdrill piled three conductors on behalf of Rhein Petroleum. A demanding job that required the lower part of two of the three pipes to be bent half a degree into the ground. On top of that, the three steel pipes had to be driven as deep as possible and exactly parallel to each other.
Erwin Bruins started his career with Wagenborg Foxdrill in the rig move operations team and is now working as a project manager. An insight into his work and career.
In Graben-Neudorf, Germany, near Karlsruhe, Deutsche ErdWärme is busy with the realization of its first geothermal project. Two wells will be drilled to a depth of around 3 700 metres to extract thermal water that will be used to generate electricity and heat for around 10 000 households.